plop SPACEPHOTOS
 Untitled Document




   Accueil » Réf S08385 (détail)

 
Ma Planche Contact / Demande de Devis : $contenupl image(s)
Autre choix d'images dans ce thème
                        
Enregistrez gratuitement cette image
en 800 pixels pour usage maquette
(click droit, Enregistrer l'image sous...)



Réf : S08385

Thème : Essais - Constructions - Satellites - Sondes - Fusées  (2314 images)

Titre : The new block 2 engine for the orbiter Atlantis is moved into place next to the

Description : (La description de cette image n'existe qu'en anglais)

(04/25/2001) -- The new block 2 engine for the orbiter Atlantis is moved into place next to the other two engines. The work is being done in the Orbiter Processing Facility bay 3. The engine will have its first flight on mission STS-104, scheduled for launch June 14. The Block II Main Engine configuration is manufactured by Boeing Rocketdyne in Canoga Park, Calif., and includes a new Pratt & Whitney high-pressure fuel turbo pump. Engine improvements are managed by NASA’s Marshall Space Flight Center in Huntsville, Ala. Each Space Shuttle Main Engine is 14 feet (4.3 meters) long, weighs about 7,000 pounds (3,175 kilograms), and is 7.5 feet (2.3 meters) in diameter at the end of the nozzle